Products
- Formwork[10]
Contact Us
- Contact Person : Ms. Yang Lina
- Company Name : Zhuozhou Sanbo Bridge Formwork Manufacture Co., Ltd.
- Tel : 0086-312-3632957,15097445351
- Fax : 0086-312-3632902
- Address : Hebei,Zhuozhou,No. 51 Xibeijie Zhuozhou, Hebei, China
- Country/Region : China
- Zip : 072750
Products List
Adjustable Circular Arc Formwork
1.the best applicability and low cost
2.compatible to any circular arc walls with diameter over 1.1m
Adjustable Circular Arc FormworkThe adjustable circular arc formwork system overcoms the disadvantage of traditional circular arc formwork and maximizes the form...
Modularized Housing Formwork
factorilization,industrialization and modernization
Housing Industrialization Equipment and Formwork SystemHousing industrialization is to build houses by industrial production to increase labor productivity of housing production, improve overall quality, lower costs, and reduce...
PIER FORMWORK (For Australia government project)
1 Material: Q235
2 More safety
3 Cast in place
The products are mainly special pier column and pier cap formworks. Types of pier columns mainly include: conic column, oblique circular column, octagonal column, dumb-bell column, Y-shaped column, gantry column, vase-shaped column,...
PIER FORMWORK (for Shijiangzhuang-Taiyuan Highway, China)
1 Manual clamp to join panels.
2 Designed for quick and easy assembly.
3 Modules pre-assembled in factory.
4 Modules pre-assembled in factory with all the necessary elements for wall curvature on site with no need for additional specialized tools.• Accessories: -...
PEIR FORMWORK(for Harbin-Dalian Railway, China)
1 Manual clamp to join panels.
2 Designed for quick and easy assembly.
3 Modules pre-assembled in factory.
The Harbin–Dalian High-Speed Railway is a high-speed rail line connecting Harbin and Dalian, in China. Construction work began on August 23, 2007. The line is...
Turnover Formwork for Viaduct of Morocco
1.resisting from inclined and wind force
2. avoiding the risk of falling down for the personnel
3.the speed of erection
Viaduct of Morocco---turnover formworkSince the pier shaft is as high as 35.5m, platform type large formwork turnover construction process is adopted in...
The Hydraulic Turnover Formwork
1.continuously casting
2.reducing the number of pre-buried auxiliary parts
3.steel structure inside and outside.
High-pier hydraulic turnover formworks of Saudi Arabia High-pier hydraulic turnover formwork is composed of working platform,hoisting...
Papilionaceous beam
1,Material: Q345
2,Strong stiffness
Papilionaceous beam
...
Tunnel Formwork
1.single formwork setting up
2.single reinforcement fixing and single pouring and forming
Tunnel formwork(housing formwork) Tunnel formwork is a combined forming mold that is on basis of large mould construction, combining wall mold and floor mold together,...
EARLY REMOVAL FORMWORK
Easy to use, safe, reliable, highly efficient and time saved
Independent support system of the early removal formwork is composed of panels, primary skeletal frames and supports. The independent support system has no secondary skeletal frame, and panels are supported by the...
Page 1 Of 1 1